{"id":2246,"date":"2025-08-24T18:00:10","date_gmt":"2025-08-24T11:00:10","guid":{"rendered":"https:\/\/sghp.vn\/?p=2246"},"modified":"2025-08-24T18:00:10","modified_gmt":"2025-08-24T11:00:10","slug":"lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich","status":"publish","type":"post","link":"https:\/\/sghp.vn\/en\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/","title":{"rendered":"Revealing the 2,800 billion bridge on Ben Luc - Long Thanh expressway is about to reach the finish line"},"content":{"rendered":"<div class=\"article__sapo cms-desc\">\n<p><strong>TPO \u2013 Binh Khanh Bridge \u2013 spanning the Soai Rap River connecting Hiep Phuoc Commune (formerly Nha Be District, Ho Chi Minh City) with Binh Khanh Commune (formerly Can Gio District, Ho Chi Minh City) of the Ben Luc \u2013 Long Thanh Expressway with a total length of more than 2.76 km was started in August 2015, with an initial total investment of more than 2,800 billion VND, and will be completed by the end of August 2025.<\/strong><\/p>\n<\/div>\n<div class=\"article__body zce-content-body cms-body\" style=\"text-align: left;\">\n<figure><img fetchpriority=\"high\" decoding=\"async\" id=\"5943365\" class=\"cms-photo lazyloaded\" title=\"Binh Khanh Bridge belongs to package J1 (construction of Binh Khanh Bridge and access roads) on the Ben Luc - Long Thanh Expressway. Binh Khanh Bridge crosses the Soai Rap River, connecting the old Nha Be district with the old Can Gio district of Ho Chi Minh City. The bridge has a total length of more than 2.76 km, of which the main bridge is 765 m long.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9975d28aad7dbc5184bdd51e2672b51cff55f4d4cf291e10c38303c5c973ba32b\/4.jpg\" alt=\"4.jpg\" width=\"1390\" height=\"1042\" data-width=\"2560\" data-height=\"1920\" data-image-id=\"5943365\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76975d28aad7dbc5184bdd51e2672b51cff55f4d4cf291e10c38303c5c973ba32b\/4.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9975d28aad7dbc5184bdd51e2672b51cff55f4d4cf291e10c38303c5c973ba32b\/4.jpg\" \/><figcaption class=\"t1\">Binh Khanh Bridge belongs to package J1 (construction of Binh Khanh Bridge and access roads) on the Ben Luc - Long Thanh Expressway. Binh Khanh Bridge crosses the Soai Rap River, connecting the old Nha Be district with the old Can Gio district of Ho Chi Minh City. The bridge has a total length of more than 2.76 km, of which the main bridge is 765 m long.<\/figcaption><\/figure>\n<figure><img decoding=\"async\" id=\"5943364\" class=\"cms-photo lazyloaded\" title=\"After a period of suspension, the bridge was restarted at the end of 2023. Binh Khanh Bridge is designed with two-plane cable-stayed bridges with H-shaped towers up to 135 m high, with a clearance of up to 55 m to ensure the safe passage of super-long and super-heavy ships on the Soai Rap waterway.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca92eaef537e51cf69bfc4030431e74100af55f4d4cf291e10c38303c5c973ba32b\/3.jpg\" alt=\"3.jpg\" width=\"1390\" height=\"1042\" data-width=\"2560\" data-height=\"1920\" data-image-id=\"5943364\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b762eaef537e51cf69bfc4030431e74100af55f4d4cf291e10c38303c5c973ba32b\/3.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca92eaef537e51cf69bfc4030431e74100af55f4d4cf291e10c38303c5c973ba32b\/3.jpg\" data-adbro-processed=\"true\" \/><span class=\"t2\">After a period of suspension, the bridge was restarted at the end of 2023. Binh Khanh Bridge is designed with two-plane cable-stayed bridges with H-shaped towers up to 135 m high, with a clearance of up to 55 m to ensure the safe passage of super-long and super-heavy ships on the Soai Rap waterway.<\/span><\/figure>\n<figure><img decoding=\"async\" id=\"5943366\" class=\"cms-photo lazyloaded\" title=\"The 57.8 km Ben Luc - Long Thanh Expressway passes through Ho Chi Minh City and Dong Nai Province. In early 2025, the Vietnam Expressway Corporation - VEC (investor) opened to traffic and put into operation nearly 30 km (two sections), including the western section from the Ho Chi Minh City - Trung Luong Expressway intersection to Nguyen Van Tao intersection and the section from Phuoc An intersection to National Highway 51 intersection.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9df45e91c38c686f3c765e00272969cf7f55f4d4cf291e10c38303c5c973ba32b\/5.jpg\" alt=\"5.jpg\" width=\"1390\" height=\"1042\" data-width=\"2560\" data-height=\"1920\" data-image-id=\"5943366\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76df45e91c38c686f3c765e00272969cf7f55f4d4cf291e10c38303c5c973ba32b\/5.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9df45e91c38c686f3c765e00272969cf7f55f4d4cf291e10c38303c5c973ba32b\/5.jpg\" \/><figcaption class=\"t1\">The 57.8 km Ben Luc \u2013 Long Thanh Expressway passes through Ho Chi Minh City and Dong Nai Province. In early 2025, the Vietnam Expressway Corporation \u2013 VEC (investor) opened to traffic and put into operation nearly 30 km (two sections), including the western section from the Ho Chi Minh City \u2013 Trung Luong Expressway intersection to Nguyen Van Tao intersection and the section from Phuoc An intersection to National Highway 51 intersection.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943362\" class=\"cms-photo lazyloaded\" title=\"Package J1 (construction of Binh Khanh bridge and approach road) is funded by JICA with a construction contract value of over 2,800 billion VND. The supervision consultant is KEI - NE - OCG - TEDI, the construction contractor is the consortium Shimizu Corporation - Vinaconex Construction and Engineering Investment Joint Stock Company.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9952a3153f8f262b5e1ff8f67c81acd55f55f4d4cf291e10c38303c5c973ba32b\/2.jpg\" alt=\"2.jpg\" width=\"1390\" height=\"1042\" data-width=\"2560\" data-height=\"1920\" data-image-id=\"5943362\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76952a3153f8f262b5e1ff8f67c81acd55f55f4d4cf291e10c38303c5c973ba32b\/2.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9952a3153f8f262b5e1ff8f67c81acd55f55f4d4cf291e10c38303c5c973ba32b\/2.jpg\" \/><figcaption class=\"t1\">Package J1 (construction of Binh Khanh bridge and approach road) is funded by JICA with a construction contract value of over 2,800 billion VND. The supervision consultant is KEI - NE - OCG - TEDI, the construction contractor is the consortium Shimizu Corporation - Vinaconex Construction and Engineering Investment Joint Stock Company.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943371\" class=\"cms-photo lazyloaded\" title=\"The bridge is 21.75m wide, with 4 lanes for motor vehicles and 2 emergency lanes, fully meeting new generation highway standards.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca959747ff7eafdec3cc65c5f12856c9203714ef85a15986e12ec866c53661a093d\/11.jpg\" alt=\"11.jpg\" width=\"1390\" height=\"781\" data-width=\"2560\" data-height=\"1440\" data-image-id=\"5943371\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b7659747ff7eafdec3cc65c5f12856c9203714ef85a15986e12ec866c53661a093d\/11.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca959747ff7eafdec3cc65c5f12856c9203714ef85a15986e12ec866c53661a093d\/11.jpg\" \/><figcaption class=\"t1\">The bridge is 21.75m wide, with 4 lanes for motor vehicles and 2 emergency lanes, fully meeting new generation highway standards.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943369\" class=\"cms-photo lazyloaded\" title=\"The project started in August 2015, however, after reaching about 70% of volume, the project had to be suspended at the end of 2018 due to capital problems. The project was restarted at the end of 2023. Currently, the package has reached nearly 98% of output, and the construction of the main bridge is on schedule.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca92bebe0e5b515142b3df82078e370c152f55f4d4cf291e10c38303c5c973ba32b\/9.jpg\" alt=\"9.jpg\" width=\"1390\" height=\"926\" data-width=\"2560\" data-height=\"1706\" data-image-id=\"5943369\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b762bebe0e5b515142b3df82078e370c152f55f4d4cf291e10c38303c5c973ba32b\/9.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca92bebe0e5b515142b3df82078e370c152f55f4d4cf291e10c38303c5c973ba32b\/9.jpg\" \/><figcaption class=\"t1\">The project started in August 2015, however, after reaching about 70% of volume, the project had to be suspended at the end of 2018 due to capital problems. The project was restarted at the end of 2023. Currently, the package has reached nearly 98% of output, and the construction of the main bridge is on schedule.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943367\" class=\"cms-photo lazyloaded\" title=\"As for the approach bridge, the remaining construction work, including railings and median strips, is currently being accelerated. According to plan, Binh Khanh Bridge will be completed by the end of August 2025.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9718d98b72746b5bb1becee1dd2877768f55f4d4cf291e10c38303c5c973ba32b\/7.jpg\" alt=\"7.jpg\" width=\"1390\" height=\"903\" data-width=\"2560\" data-height=\"1664\" data-image-id=\"5943367\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76718d98b72746b5bb1becee1dd2877768f55f4d4cf291e10c38303c5c973ba32b\/7.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9718d98b72746b5bb1becee1dd2877768f55f4d4cf291e10c38303c5c973ba32b\/7.jpg\" \/><figcaption class=\"t1\">As for the approach bridge, the remaining construction work, including railings and median strips, is currently being accelerated. According to plan, Binh Khanh Bridge will be completed by the end of August 2025.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943368\" class=\"cms-photo lazyloaded\" title=\"Currently, on the Ben Luc - Long Thanh expressway, there is also Phuoc Khanh bridge across Long Tau river connecting the old Can Gio district (HCMC) with the old Nhon Trach district (Dong Nai province) which was also restarted in May 2025.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9a864180375328176c9f8198ddffe1908f55f4d4cf291e10c38303c5c973ba32b\/8.jpg\" alt=\"8.jpg\" width=\"1026\" height=\"720\" data-width=\"1026\" data-height=\"720\" data-image-id=\"5943368\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76a864180375328176c9f8198ddffe1908f55f4d4cf291e10c38303c5c973ba32b\/8.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9a864180375328176c9f8198ddffe1908f55f4d4cf291e10c38303c5c973ba32b\/8.jpg\" \/><figcaption class=\"t1\">Currently, on the Ben Luc - Long Thanh expressway, there is also Phuoc Khanh bridge across Long Tau river connecting the old Can Gio district (HCMC) with the old Nhon Trach district (Dong Nai province) which was also restarted in May 2025.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943372\" class=\"cms-photo lazyloaded\" title=\"According to plan, Phuoc Khanh bridge will be completed and put into operation in September 2026.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca96523f747d534f43cc2156c7659d92249714ef85a15986e12ec866c53661a093d\/12.jpg\" alt=\"12.jpg\" width=\"1390\" height=\"926\" data-width=\"2560\" data-height=\"1707\" data-image-id=\"5943372\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b766523f747d534f43cc2156c7659d92249714ef85a15986e12ec866c53661a093d\/12.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca96523f747d534f43cc2156c7659d92249714ef85a15986e12ec866c53661a093d\/12.jpg\" \/><figcaption>According to plan, Phuoc Khanh bridge will be completed and put into operation in September 2026.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943370\" class=\"cms-photo lazyloaded\" title=\"The upcoming completion of Binh Khanh Bridge (package J1) and Phuoc Khanh Bridge (package J3, expected to be completed in 2026) will complete the entire Ben Luc - Long Thanh expressway.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9e479d5ea9a34bed5d683c9f01f33ae66714ef85a15986e12ec866c53661a093d\/10.jpg\" alt=\"10.jpg\" width=\"1390\" height=\"781\" data-width=\"2560\" data-height=\"1440\" data-image-id=\"5943370\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76e479d5ea9a34bed5d683c9f01f33ae66714ef85a15986e12ec866c53661a093d\/10.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9e479d5ea9a34bed5d683c9f01f33ae66714ef85a15986e12ec866c53661a093d\/10.jpg\" \/><figcaption class=\"t1\">The upcoming completion of Binh Khanh Bridge (package J1) and Phuoc Khanh Bridge (package J3, expected to be completed in 2026) will complete the entire Ben Luc - Long Thanh expressway.<\/figcaption><\/figure>\n<figure><img loading=\"lazy\" decoding=\"async\" id=\"5943361\" class=\"cms-photo lazyloaded\" title=\"From here, the key inter-regional traffic axis in the South will be connected. Binh Khanh Bridge is the largest bridge on the entire route, with a total investment of more than 2,800 billion VND.\" src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9b9809aaea0ee4df7b9d25f7bfc7f6241f55f4d4cf291e10c38303c5c973ba32b\/1.jpg\" alt=\"1.jpg\" width=\"1390\" height=\"1042\" data-width=\"2560\" data-height=\"1920\" data-image-id=\"5943361\" data-large-src=\"https:\/\/cdn.tienphong.vn\/images\/7a1dc3ccebd2b7f69317183651a88b76b9809aaea0ee4df7b9d25f7bfc7f6241f55f4d4cf291e10c38303c5c973ba32b\/1.jpg\" data-src=\"https:\/\/cdn.tienphong.vn\/images\/0b69b2bfe7bd891e9450796969567ca9b9809aaea0ee4df7b9d25f7bfc7f6241f55f4d4cf291e10c38303c5c973ba32b\/1.jpg\" \/><figcaption class=\"t1\">From here, the key inter-regional traffic axis in the South will be connected. Binh Khanh Bridge is the largest bridge on the entire route, with a total investment of more than 2,800 billion VND.<\/figcaption><\/figure>\n<\/div>\n<p style=\"text-align: right;\"><em><strong>tienphong.vn<\/strong><\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>TPO \u2013 Binh Khanh Bridge \u2013 spanning the Soai Rap River connecting Hiep Phuoc Commune (former Nha Be District, Ho Chi Minh City) with Binh Khanh Commune (former Can Gio District, Ho Chi Minh City) of the Ben Luc \u2013 Long Thanh Expressway with a total length of more than 2.76 km was started in August 2015, with an initial total investment of [\u2026]<\/p>","protected":false},"author":3,"featured_media":2247,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2246","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.5 (Yoast SEO v24.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch - Saigon Gateway Terminal<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sghp.vn\/en\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch\" \/>\n<meta property=\"og:description\" content=\"TPO &#8211; C\u1ea7u B\u00ecnh Kh\u00e1nh &#8211; b\u1eafc qua s\u00f4ng So\u00e0i R\u1ea1p n\u1ed1i x\u00e3 Hi\u1ec7p Ph\u01b0\u1edbc (huy\u1ec7n Nh\u00e0 B\u00e8 c\u0169, TPHCM) v\u1edbi x\u00e3 B\u00ecnh Kh\u00e1nh (huy\u1ec7n C\u1ea7n Gi\u1edd c\u0169, TPHCM) c\u1ee7a cao t\u1ed1c B\u1ebfn L\u1ee9c &#8211; Long Th\u00e0nh v\u1edbi t\u1ed5ng chi\u1ec1u d\u00e0i h\u01a1n 2,76 km \u0111\u01b0\u1ee3c kh\u1edfi c\u00f4ng t\u1eeb th\u00e1ng 8\/2015, t\u1ed5ng m\u1ee9c \u0111\u1ea7u t\u01b0 ban [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sghp.vn\/en\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/\" \/>\n<meta property=\"og:site_name\" content=\"Saigon Gateway Terminal\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-24T11:00:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1390\" \/>\n\t<meta property=\"og:image:height\" content=\"1043\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/\",\"url\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/\",\"name\":\"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch - Saigon Gateway Terminal\",\"isPartOf\":{\"@id\":\"https:\/\/sghp.vn\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg\",\"datePublished\":\"2025-08-24T11:00:10+00:00\",\"author\":{\"@id\":\"https:\/\/sghp.vn\/#\/schema\/person\/0f6b857a9f3e2c370582fe5e1797b284\"},\"breadcrumb\":{\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage\",\"url\":\"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg\",\"contentUrl\":\"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg\",\"width\":1390,\"height\":1043},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/sghp.vn\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c &#8211; Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/sghp.vn\/#website\",\"url\":\"https:\/\/sghp.vn\/\",\"name\":\"C\u1ea3ng S\u00e0i G\u00f2n Hi\u1ec7p Ph\u01b0\u1edbc\",\"description\":\"Saigon Gateway Terminal Joint Stock Company (SGT).\",\"alternateName\":\"C\u1ea3ng S\u00e0i G\u00f2n Hi\u1ec7p Ph\u01b0\u1edbc\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/sghp.vn\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/sghp.vn\/#\/schema\/person\/0f6b857a9f3e2c370582fe5e1797b284\",\"name\":\"Editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/sghp.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/sghp.vn\/wp-content\/litespeed\/avatar\/2fe9e726a98b887f3ff418d1a1585210.jpg?ver=1777930303\",\"contentUrl\":\"https:\/\/sghp.vn\/wp-content\/litespeed\/avatar\/2fe9e726a98b887f3ff418d1a1585210.jpg?ver=1777930303\",\"caption\":\"Editor\"},\"url\":\"https:\/\/sghp.vn\/en\/author\/editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch - Saigon Gateway Terminal","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sghp.vn\/en\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/","og_locale":"en_US","og_type":"article","og_title":"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch","og_description":"TPO &#8211; C\u1ea7u B\u00ecnh Kh\u00e1nh &#8211; b\u1eafc qua s\u00f4ng So\u00e0i R\u1ea1p n\u1ed1i x\u00e3 Hi\u1ec7p Ph\u01b0\u1edbc (huy\u1ec7n Nh\u00e0 B\u00e8 c\u0169, TPHCM) v\u1edbi x\u00e3 B\u00ecnh Kh\u00e1nh (huy\u1ec7n C\u1ea7n Gi\u1edd c\u0169, TPHCM) c\u1ee7a cao t\u1ed1c B\u1ebfn L\u1ee9c &#8211; Long Th\u00e0nh v\u1edbi t\u1ed5ng chi\u1ec1u d\u00e0i h\u01a1n 2,76 km \u0111\u01b0\u1ee3c kh\u1edfi c\u00f4ng t\u1eeb th\u00e1ng 8\/2015, t\u1ed5ng m\u1ee9c \u0111\u1ea7u t\u01b0 ban [&hellip;]","og_url":"https:\/\/sghp.vn\/en\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/","og_site_name":"Saigon Gateway Terminal","article_published_time":"2025-08-24T11:00:10+00:00","og_image":[{"width":1390,"height":1043,"url":"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg","type":"image\/jpeg"}],"author":"Editor","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Editor","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/","url":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/","name":"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c - Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch - Saigon Gateway Terminal","isPartOf":{"@id":"https:\/\/sghp.vn\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage"},"image":{"@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage"},"thumbnailUrl":"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg","datePublished":"2025-08-24T11:00:10+00:00","author":{"@id":"https:\/\/sghp.vn\/#\/schema\/person\/0f6b857a9f3e2c370582fe5e1797b284"},"breadcrumb":{"@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#primaryimage","url":"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg","contentUrl":"https:\/\/sghp.vn\/wp-content\/uploads\/2025\/08\/4.jpg","width":1390,"height":1043},{"@type":"BreadcrumbList","@id":"https:\/\/sghp.vn\/lo-dien-cau-2-800-ty-tren-cao-toc-ben-luc-long-thanh-sap-ve-dich\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/sghp.vn\/"},{"@type":"ListItem","position":2,"name":"L\u1ed9 di\u1ec7n c\u1ea7u 2.800 t\u1ef7 tr\u00ean cao t\u1ed1c B\u1ebfn L\u1ee9c &#8211; Long Th\u00e0nh s\u1eafp v\u1ec1 \u0111\u00edch"}]},{"@type":"WebSite","@id":"https:\/\/sghp.vn\/#website","url":"https:\/\/sghp.vn\/","name":"C\u1ea3ng S\u00e0i G\u00f2n Hi\u1ec7p Ph\u01b0\u1edbc","description":"Saigon Gateway Terminal Joint Stock Company (SGT).","alternateName":"C\u1ea3ng S\u00e0i G\u00f2n Hi\u1ec7p Ph\u01b0\u1edbc","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sghp.vn\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/sghp.vn\/#\/schema\/person\/0f6b857a9f3e2c370582fe5e1797b284","name":"Editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/sghp.vn\/#\/schema\/person\/image\/","url":"https:\/\/sghp.vn\/wp-content\/litespeed\/avatar\/2fe9e726a98b887f3ff418d1a1585210.jpg?ver=1777930303","contentUrl":"https:\/\/sghp.vn\/wp-content\/litespeed\/avatar\/2fe9e726a98b887f3ff418d1a1585210.jpg?ver=1777930303","caption":"Editor"},"url":"https:\/\/sghp.vn\/en\/author\/editor\/"}]}},"_links":{"self":[{"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/posts\/2246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/comments?post=2246"}],"version-history":[{"count":1,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/posts\/2246\/revisions"}],"predecessor-version":[{"id":2248,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/posts\/2246\/revisions\/2248"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/media\/2247"}],"wp:attachment":[{"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/media?parent=2246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/categories?post=2246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sghp.vn\/en\/wp-json\/wp\/v2\/tags?post=2246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}