Equipment

TERMINAL NAME
Country NameVIETNAM
Port CodeVNSPH
Port NameSAIGON PORT – HIEP PHUOC
Terminal CodeSGHP (Already had the terminal code in ZIM's system when handling the RORO vessel MONZA on April 2024)
Terminal phone(+84 8) 3943 2454
Terminal addressD10C D3 Road, Hiep Phuoc Commune, Ho Chi Minh City, Vietnam
teamwww.sghp.vn
MARINE NAVIGATIONS
Approach Channel Depth (m)-9.5 (-10.5 to -11.0 with marine notice from Port Authority by end of 2025)
Turning Basin Width (m)450
Maximum draft alongside berth at high tide (m)13.5
Maximum draft alongside berth at low tide (m)11.5
Maximum draft in approach at high tide (m)13.5
Maximum draft in approach at low tide (m)11.5
Tidal Range (m)0.5m – 3.5m
Air draft at MSL (m)No restriction
Air-clearance / UKC (m)10% Draft
Distance from Pilot Station to Berth (Nautical Mile)41
Steaming time from Pilot Station to Berth (hrs)2,5
Maximum vessel length at berth (m)800
TERMINAL FACILITIES – BERTH
Berth length with mooring dolphin (m)800
Container barge berth (m)320
Vessel size270
Terminal Capacity (TEU)0.5 million TEU cross quay
TERMINAL FACILITIES – CRANES
Swing Cranes (STS)03 are available
Under Hook Shore Gantry Crane SWL (MT)45
Under Spreader SWL (MT)40
Minimum Distance between Quay Cranes (# of bays or20 Meter
Container Maximum Permisable Weight (MT)Payload + Tare
Twin/tandem crane operationTwin
Twin/dual hoist capacities (MT)50.75
Distance from pier to Spreader Bottom (m)32m
Maximum Outreach (rows)14-15 rows
Maximum deck tier height that can be worked at low waterFor max tiers, it depends on vessel characteristics, Line to determine based on crane, berth, and tidal data provided by estimate target SGPH can handle 06 tier for standard containers and 05 tier for HC containers.(In
Rotary Cranes (MHC)3
Maximum Weight (MT)30
Maximum Outreach (m)5-28
Container Maximum Permisable Weight (MT)Payload + Tare
Rotation speed (turns/min.)0.96
Crane rotation speed (move/min.)20
Actual hook lifting height (m)50
TERMINAL FACILITIES – CONTAINER YARDS
Total area36.06 hectares with 20 hectares in operation
Number of RTGs2
No. of Laden Container Handlers04 is available
01 is availableon process 01 is going to operate
Number of Weight Bridges (80 mt)4
Number of Reefer Plugs36-in-1 Budget Plan
Breakbulk AcceptanceYES
EDI & Operations softwareYes
OOG AcceptanceYES
TERMINAL OPERATION
writer Vu37+ GMPH
Truck turn times7-8 minutes for single transactions; 9 minutes for dual transactions
Yard ops time (24 hours or less)24 hours
Working time24/7
TOSCEH
Gang shift (How many? Time range)3 Gang shifts. Day shift: 07:30 to 19:30; Night shift: 19:30 to 07:30
Yard ops time (24 hours or less)24 hours
Working time24/7
M&R team (yes or no)Yes
ICD Network
ICD'S HCM CITY, BINH DUONG, DONG NAIICD TRANSIMEX, ICD TANAMEXCO, ICD PHUC LONG, ICD PHUOC LONG, ICD SOTRANS BINH DUONG PORT, DONG NAI PORT, SOWATCO LONG BINH PORT CAT LAI, GIANG NAM
Cargo Road Connection
Ring road number 3 (Ben Luc – Long Thanh Express Way)Had already active